Demo Video

Hard to Reach Places

Concrete Slab Prep

Conveyer Aggregate Delivery (CAD)

Commercial

When placing material for concrete slab prep with a skid loader and 3 labors we place and grade over 2500 per hour without any broken pipes. No need to have electricians go back an dig up a prepped slab to bury conduit, saving days or weeks on a project.

Residential

We can place sand inside a stem wall at rate of over 100 yards per hour. We don’t put skid steers inside stem walls so will not break any pipes, especially with HVAC ducts in the stem wall.

Save Time. Save Money.

With placement rate of over 200 tons per hour we can backfill any job quickly and easily. We place rock, sand, dirt, topsoil, select fill, mulch and other materials for driveways sidewalks, slabs, retaining walls, fuel tanks, infiltrators, play grounds, and many other projects

Services include

  • Commercial Concrete Prep
  • Residential Concrete Prep
  • Fuel Tanks
  • Basements
  • Retaining Walls
  • Specialty Jobs
  • Ponds
  • Enviromental
  • Laser Grading
  • Commercial Concrete Prep

Copyright © 2017 - All Rights Reserved - Cad Oklahoma LLC

Design: CAD Oklahoma